河渠護坡磚生成原理

足球比分WANGZHI:wmzl5.com   2019-10-21  ZUOZHE:admin    YUEDU:

河渠護坡磚生成原理1、準備河渠護坡模具一個,振動平臺一臺,混合好的混凝土適量。2、將混合好的混凝土倒入河渠護坡塑料模具或者是河渠護坡鋼模具內,經振動平臺振動30秒左右,去下置于陰涼避光的倉庫之內。3、放置一定的時間大約24小時左右冬季一般放置2-3天。4、待混凝土凝固成型之后進行拆模或者脫模成型。
The formation principle of river slope protection brick 1. Prepare a river slope protection mold, a vibration platform, and mix a proper amount of concrete. 2. Pour the mixed concrete into the plastic mold or steel mold of river slope protection, vibrate it for about 30 seconds through the vibration platform, and then place it in a cool and dark warehouse. 3. It is generally placed for 2-3 days in winter for about 24 hours. 4. After the concrete is solidified and formed, the formwork shall be removed or demoulded.